Electronic Resum&eactue; of Peter Prevos

Design & Construction of Geotextile Storage Hall

This hall was designed for the storage of geotextile and other materials required for the construction of the river training works for the Jamuna Multipurpose Bridge in 1995.

Welding Construction Geotextile Store Design drawing